
Description: Transferring 90' long 30" diameter piles from truck to barge for delivery to work site, total tonnage 600 ton. The piles were destined for a new floating breakwater to be used for harbor patrol boats at Rikers Island.
Location: Elizabeth, NJ
Customer: Spearin Preston & Burrows
Comments: CME also has experience in transferring heavy equipment, caissons, prefabricated steel, steel and concrete pilings and other construction material arriving by rail onto the facility or by heavy haul trucks.
 

|